4/18/2023 0 Comments Swift river(ii) accommodation, including accommodation for prisoners, office space and storage facilities for police supplies and equipment, (i) transportation to remote or isolated locations if the means of transportation are not available to the Royal Canadian Mounted Police, the Sheriffs’ Services or the peace officer making the request, (c) provide, at reasonable cost, all goods and services requested by the Royal Canadian Mounted Police, the Sheriffs’ Services of the Province and any other peace officers that are required by them to carry out their duties in connection with the pipeline, including (b) provide physical security in respect of each campsite or worksite established by Foothills and the building and property of Foothills and Securityģ0 Foothills, in consultation with the Government of Canada, the government of the Province and the Royal Canadian Mounted Police, shall HealthĢ9 Foothills shall ensure that the health of all persons employed on or in connection with the construction of the pipeline is safeguarded by the implementation of generally accepted public health standards. ![]() Protection of Highways and Public UtilitiesĢ8 Foothills shall consult with the governments of the Province and the Yukon Territory and those regulatory authorities of the Province and the Yukon Territory having jurisdiction over roads, highways and public utilities in respect of the proposed pipeline construction for the purpose of devising means to avoid any damage to any road, highway or public utilities. (b) any telecommunication infrastructure Foothills requires for the construction of the pipeline is built and maintained in such manner as to improve the existing telecommunication services. (a) the use by Foothills of telecommunication services for the pipeline does not adversely affect the telecommunication services in the Province and ![]() TelecommunicationsĢ7 Foothills shall ensure that, where practical, PART I Socio-Economic Terms and Conditions (continued) Transportation and Logistics (continued)Ģ5 Foothills shall bear the cost of any additional transportation infrastructure provided, at the request of Foothills, by the Government of Canada or the government of the Province for the construction of the pipeline and, where practical, shall ensure that such infrastructure is built, maintained and disposed of to provide maximum long-term benefit to those communities affected by the additional transportation infrastructure.Ģ6 Foothills shall submit to the designated officer for his approval a plan, to be known as the transportation and logistics plan, that sets out the manner in which Foothills intends to carry out the provisions of sections 24 and 25.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |